We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 distinct branches. For far more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Item DISPLASY
Identify:
Customized produced heat resistant big diameter mc nylon sixty six pipe tube inexpensive plastic nylon tube
M Mobile: +86~thirteen 0571 88828: ten ctns / piece
S20*3/8F | 40 | 48*23.5*23.5 | four hundred |
S20*1/2F | forty five | forty eight*23.5*23.5 | four hundred |
S20*3/4F | sixty | 48*23.5*23.five | 250 |
S25*1/2F | 46 | forty eight*23.5*23.5 | three hundred |
S25*3/4F | sixty three | forty eight*23.5*23.5 | 280 |
S32*1/2F | fifty | forty eight*23.5*23.5 | 220 |
S32*3/4F | sixty six | forty eight*23.5*23.5 | 200 |
S32*1″F | 100 | 48*23.5*23.5 | 160 |
S40*11/4F | a hundred seventy five | forty eight*23.5*23.5 | 80 |
S50*eleven/2F | 195 | forty eight*23.5*23.5 | 72 |
S63*2F | 325 | 48*23.5*23.five | 36 |
S75*2 1/2F | 580 | forty eight*23.5*23.5 | 24 |
S90*3F | 880 | forty eight*23.5*23.five | fourteen |
S110*4F | 930 | forty eight*23.5*23.five | ten |
PRODUCT Features
EPT PIPE,QUALI EPT ASSURANCE
1. EPT PPR pure raw material, there is no pungent smell when they are related. It only produce carbon dioxide and water after combustion.
two. Merchandise rewards: Light-weight content great temperature and pressure steadiness secure connection, trustworthy and handy performance, tiny friction in pipe technique excellent hydraulic conditions healthier functionality, no odor, environmental and healthy outstanding sound insulation and chemical resistance.
pipeline relationship engineering:
Considering that the outermo EPT layer of PP-R pipe components, large-functionality fiber composite pipe PP-R pipe fittings available sizzling-soften socket connection forming a pipeline system. When connected, necessitating melt temperature reached to 260 levels Celsius, pipe and fittings for area cleansing following a suitable time even though heating the fuser and can be plugged minimal melt relationship price, easy procedure, risk-free and reliable.It can successfully avoid the occurrence of junction leakage.
special reminder:
Pipe and fittings are employed for the link,which are presented by “SAM-British isles”. Simply because diverse manufacturers may possibly differ from the choice of materials. So it is not able to be certain the high quality of the welding connection. Strongly suggested to use unique hot-melt welding products with temperature control, to prevent welding too very hot or also chilly, which may affect the quality of welding.
EPT PPR pipe, Environmentally friendly, safe and reliable
Primarily our raw materia EPT are imported.And our merchandise are manufactured by professional tools. Expert layout and every detail of pipe fittings, piping method,we hold each and every step. They are protected, safe, dependable and efficient solution to the concealed house enhancement projectthey are straightforward to leak pipes, bur EPT pipes and EPT dangers.
Production process and line manage
Orderly management workshop
Precautions
Hydrostatic force take a look at
For the duration of our decoration, after the completion of welding pipes,we need inspect the high quality of pipes, that is we often say the force test. The design of pipes belongs to hidden functions in the decoration. When concealed engineering problems appear, the implications is incalculable. If the pipe is buried in the ground or flooring tiles, the co EPT of reconstruction will be really huge.
one. Pipes mounted, the look verify is qualified, then the pressure te EPT can be carried out
two. scorching melt or fused connection pipe, the hydrostatic te EPT after 24 hours of the connection
3. Medium is thoroughly clean drinking water at area temperature. When in a huge system, it can be layered, parted to te EPT the strain.
Water force / approach:
one. The very hot and cold h2o related together by hose. Then hot and chilly drinking water varieties a ring, force testing device connected to any outlet,the pressure pointer is . When all the water pipelines set up, the the strain te EPT could start. To block all of the plugs and close the h2o inlet valve manifold prior to the examination.
two. When we do the test, shake the jack lever right up until the gauge pointer all around .9-1., it is also stated that the present stress is 3 moments than the normal water pressure.
three.Hold this stress price for a particular time, Diverse time ,the water load time is different, PPR, aluminum PPR, PPR and EPT steel-plastic pipe welding time is thirty minutes. Aluminum pipe, that’s also the galvanized pips, it wants 4 hrs.
PPR pipeline development protection:
1.PPR pipe cross resistance to ultraviolet radiation, not ideal for out of doors surface mounted installation. If they truly want, you need to have to take shielding measures.
2. PPR pipe’s low temperature effect resistance is very poor, it need to be vent pipes to prevent freezing, inflammation
and crack the pipes in winter season.
three. Water-resistant bathroom location, frequently employing asphalt and EPT petrochemical substances. When it is undertaking water-proof requirements shelter on pipeline safety.
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 diverse branches. For more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original products manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference purposes only and for indicating merchandise use and compatibility. Our firm and the listed alternative areas contained herein are not sponsored, accepted, or manufactured by the OEM.